Free Time and Material Invoice
T&M work bleeds profit when your invoice cannot show what happened. This template captures every hour and every material by day, applies real markup, and prints as a signed record. No client can argue "we did not authorize that" when the paper says otherwise.
Download Excel (.xlsx) | Download PDF. Free, no email required.
Who it is for
Built for GCs and subs doing time-and-materials work: emergency repairs, punch-list, change-order add-ons, insurance restoration. Excel has a per-day breakdown: worker name and role, hours worked, hourly rate (labor loaded), day total. Materials block per day with item, quantity, unit cost, and markup. Totals roll to weekly then invoice grand total. Uses real 2026 rates: 1.5 to 2x labor loaded rate over base wage, 10 to 25 percent material markup depending on order size. PDF version is a print-ready invoice with the same layout plus a signature line for client sign-off.
What is inside
- Header: contractor info, client info, invoice number, week ending date
- Daily labor tab (Excel) or block (PDF): 7 days
- Per day: worker name, role, hours, hourly rate, day labor total
- Per day materials: item, quantity, unit cost, markup percent, total
- Weekly labor subtotal and materials subtotal (auto-calc in Excel)
- Labor loaded rate reference (base wage x 1.5 to 2 = burdened rate)
- Markup guide by material category (10 to 25 percent)
- Grand total, prior payments, balance due
- Client sign-off block per day (initials) plus final signature
Preview: what is in the file
The first rows of the spreadsheet, as you will see them in Excel or Google Sheets. Cells marked "auto" are formulas.
| TIME AND MATERIAL INVOICE | | | | | |
| From: | | To: | | | |
| Company | | Client | | | |
| Address | | Address | | | |
| Phone | | | | | |
| License # | | Project | | | |
| Invoice # | | Week Ending | | | |
| Invoice Date | date | Payment Terms | Net 15 | | |
| LABOR LOG - PER DAY | | | | | |
| Day | Worker | Role | Hours | Loaded Rate | Total |
| Mon | | | 0 | 0 | |
| Mon | | | 0 | 0 | |
| Tue | | | 0 | 0 | |
| Tue | | | 0 | 0 | |
| Wed | | | 0 | 0 | |
| Wed | | | 0 | 0 | |
| Thu | | | 0 | 0 | |
| Thu | | | 0 | 0 | |
| Fri | | | 0 | 0 | |
| Fri | | | 0 | 0 | |
| Sat | | | 0 | 0 | |
| Sun | | | 0 | 0 | |
How to use it
- Track hours daily, not weekly. End of each shift, worker records hours on that day. Weekly reconstruction is when disputes happen. If you use time-tracking software, export to fill this in.
- Use the loaded rate, not the base wage. Base wage $30 becomes loaded rate $45 to $60 (1.5x to 2x) after taxes, workers comp, benefits, overhead. Billing base wage loses you money. The loaded rate is what T&M invoices should reflect.
- Apply real markup on materials. 10 percent on large bulk orders ($5K+ per material), 15 to 20 percent standard, 25 percent on small pickup orders under $200. Do not undercut material markup on T&M. Client accepted T&M knowing markup applies.
- Get daily initials from the client rep. Have the owner or their rep initial each day the work happened. Prevents "I did not authorize Wednesday" arguments at invoice time.
- Attach receipts. Every material receipt gets a photo and gets attached to the invoice. Transparent T&M billing gets paid faster because the client sees you are not padding.
Or skip the template
EZ-Estimates turns a quick voice note from the job site into a line item estimate your client can sign online. See how the AI Estimator works.
FAQ
What is a loaded labor rate?
Base wage plus taxes, workers comp, insurance, benefits, and overhead. Base wage $30/hr typically loads to $45 to $60/hr. That is what you bill on T&M work to break even. Anything below is losing money.
What markup should I add to materials?
15 to 25 percent for residential, 10 to 20 percent for commercial. Small orders (under $200) can carry 25 to 30 percent to cover the pickup time. Large bulk orders (over $5K) run 8 to 12 percent because volume justifies lower margin.
When should I bill T&M vs fixed price?
T&M for scopes where you cannot predict the work (emergency repairs, insurance restoration, hidden condition remediation). Fixed price for defined scopes. T&M without a "not to exceed" cap is where clients get uncomfortable, so set an NTE amount.
How do I handle overtime hours?
Bill straight loaded rate for regular hours and 1.5x loaded rate for overtime (over 40 hrs/week or over 8 hrs/day in some states). Show OT separately on the invoice so the client understands why the rate differs.
Should the client sign daily?
Ideal but not always practical. If the owner or GC rep is on site, get initials daily. If unmanned, take timestamped photos of the work each day as proof. Signed daily beats reconstructed weekly every time.
Does EZ-Estimates support T&M billing?
Yes. EZ-Estimates has a T&M invoice mode where crews log hours in the app and materials add automatically to a running invoice. Client approves at the end of the week from the portal.