Free Material Takeoff Spreadsheet
Guessing material quantities is how contractors eat leftover lumber and short orders on drywall day. This takeoff spreadsheet counts what you need trade by trade, applies real waste factors, and rolls markup into a total you can drop straight into a bid.
Download Excel (.xlsx) | Download PDF. Free, no email required.
Who it is for
Built for GCs and subs quantifying materials from plans. Five trade tabs (drywall, framing, roofing, concrete, siding) with realistic 2026 waste factors baked in: drywall 10 to 15 percent, framing 5 to 10 percent, roofing 10 to 15 percent, concrete 5 to 10 percent, siding 10 percent. Each line calculates quantity times unit price times one plus waste percent, then a Totals tab rolls every trade into a project material cost plus markup. Use for takeoffs from architectural drawings or field measurements.
What is inside
- Materials by Trade tab: master list of common materials with default units
- Drywall tab: sheets, screws, mud, tape, corner bead with 10 to 15 percent waste
- Framing tab: studs, plates, sheathing, headers, joists with 5 to 10 percent waste
- Roofing tab: shingles, underlayment, ice and water, drip edge, ridge cap with 10 to 15 percent waste
- Concrete tab: cubic yards, rebar, mesh, form lumber, release agent with 5 to 10 percent waste
- Siding tab: siding, trim, fasteners, house wrap, flashing with 10 percent waste
- Totals tab: rolls all trades into project subtotal, adds markup percent, tax, and grand total
- Waste Factors reference sheet with industry benchmarks
Preview: what is in the file
The first rows of the spreadsheet, as you will see them in Excel or Google Sheets. Cells marked "auto" are formulas.
| MATERIALS BY TRADE - REFERENCE | | | |
| Trade | Common Materials | Default Unit | Typical Waste % |
| Drywall | 1/2" sheet, 5/8" sheet, screws, mud, tape, corner bead | sq ft / bundle | 10-15% |
| Framing | 2x4 stud, 2x6 stud, 2x10 joist, OSB sheathing, plates, headers | each / sheet | 5-10% |
| Roofing | Architectural shingles, underlayment, ice/water shield, drip edge, ridge cap | square / roll | 10-15% |
| Concrete | Ready-mix, rebar #4, wire mesh, form lumber, release agent | cubic yard / lin ft | 5-10% |
| Siding | Vinyl/fiber cement plank, trim, fasteners, house wrap, flashing | sq ft / lin ft | 10% |
| Note: Waste % pre-loaded on each trade tab. Adjust per site conditions. | | | |
How to use it
- Start with plans or field measurements. Measure square footage per trade. Drywall in square feet of wall and ceiling area. Framing in linear feet or square feet. Roofing in squares (100 sq ft). Concrete in cubic yards. Siding in square feet.
- Enter quantity and unit price per line. The formula multiplies quantity times unit price times one plus waste percent. Waste percent is pre-filled with industry defaults. Override if your job runs tighter or looser.
- Adjust waste factors for site conditions. Complex roofs bump roofing waste to 15 percent. Simple gable roofs stay at 10. Long straight walls of siding at 8 percent. Cut-heavy dormered walls at 12.
- Roll up on the Totals tab. Each trade tab feeds the Totals tab automatically. Apply your markup percent (materials typically 15 to 25 percent), tax, and grand total appears at the bottom.
- Drop into your estimate. The Totals number is your material line item. Add labor separately in your estimate template. Send the whole estimate in 60 seconds with EZ-Estimates.
Or skip the template
EZ-Estimates turns a quick voice note from the job site into a line item estimate your client can sign online. See how the AI Estimator works.
FAQ
What waste factor should I use for drywall?
10 percent for standard rooms with straight walls, 15 percent for cut-heavy work (soffits, vaulted ceilings, lots of penetrations). The default in this template is 12 percent as a middle ground.
How do I estimate roofing squares from drawings?
One square equals 100 square feet of roof surface (not floor plan). Measure roof surface with pitch factored in. A 8/12 pitch adds about 20 percent to the flat footprint. The template assumes surface area, so measure accordingly.
What markup should I apply to materials?
15 to 25 percent is standard for residential remodeling. Higher on small orders (30 percent) to cover handling, lower on large bulk orders (10 to 15 percent). Commercial work runs 8 to 12 percent because volume is higher.
Can I add trades not included?
Yes. Duplicate the Framing tab, rename it, and edit the line items. Link the new tab total into the Totals tab formula. Excel keeps the formula pattern intact.
Is this a substitute for takeoff software like PlanSwift?
No. PlanSwift measures directly from digital plans. This spreadsheet organizes and prices what you already measured. Use both if you have PlanSwift. Use just this if you measure by hand.
Does EZ-Estimates handle takeoffs?
Yes. Voice describe the project and EZ-Estimates estimates the materials, applies waste factors, and adds markup. Saves the tab-switching entirely.
Related reads
All free templates | Back to EZ-Estimates